category,question,why_it_matters,buyer_tip Business Context,What production/process does the crane support?,Connects crane design to downtime impact,Describe the business process not only the load Business Context,Is the crane production-critical or support-only?,Changes reliability and service expectations,Production-critical cranes need stronger support clauses Business Context,What happens if the crane stops for 24 hours?,Quantifies downtime risk,Use this in TCO scoring Business Context,Is this a new crane or replacement/retrofit?,Retrofits have extra site and interface risk,Ask for site survey before final offer Load,What is maximum lifted load?,Defines rated capacity basis,Do not add random margin without technical discussion Load,What is typical daily lifted load?,Separates rare max load from routine duty,Useful for duty and TCO discussion Load,What is load shape and center of gravity behavior?,Impacts sling/load control,Attach sketches/photos if possible Load,Does load swing create process or safety risk?,Controls speed/control needs,Consider VFD/creep speed and operator visibility Load,Are there special loads such as magnet/grab/hot metal?,Special loads change safety and design assumptions,Declare early; do not treat as normal hook duty Geometry,What is required span center-to-center of rails?,Core layout input,Confirm against actual runway/building survey Geometry,What is required lifting height?,Controls hoist selection and headroom,Measure usable lift not only building height Geometry,What hook approach is needed on each side?,Determines usable working envelope,Ask vendor for approach dimensions in drawing Geometry,What headroom constraints exist?,Affects girder/hoist arrangement,Important for low buildings Geometry,Are runway beams/rails existing?,Separates crane supply from civil/structural risk,Ask who validates runway suitability Duty,How many lifts per shift are expected?,Defines service intensity,Use realistic busy-day count Duty,How many shifts per day?,Changes duty and maintenance expectations,Do not understate shifts to reduce quote Duty,Is operation continuous/intermittent/standby?,Controls duty class conversation,Ask vendor to state duty basis explicitly Duty,Are starts/stops frequent?,Impacts motors/brakes/drives,Frequent positioning needs stronger controls Duty,Is precision placement required?,Impacts speed, VFD, creep speed, and controls,Describe tolerance or operator task Motion,Required hoist speed?,Controls productivity and safety,Ask for full and creep speed if needed Motion,Required cross travel speed?,Controls bay positioning,Match to process not vendor default Motion,Required long travel speed?,Controls movement time,Consider bay length and traffic Motion,Is two-speed or VFD control required?,Impacts smoothness and load swing,VFD often improves control for precision work Electrical,What supply voltage/frequency is available?,Avoids wrong electrical assumptions,Confirm with maintenance/electrical team Electrical,Are power supply limits or voltage drops known?,Prevents site commissioning surprises,Ask vendor for electrical load data Electrical,Preferred conductor system?,Affects reliability and maintenance,Clarify DSL/busbar/cable reel/festoon as applicable Electrical,Required panel protection level?,Environment-dependent,Specify dust/moisture/heat exposure Environment,Indoor or outdoor?,Changes protection and structure requirements,Outdoor requires weather/wind/drainage discussion Environment,Dust level?,Affects electrical and mechanical life,Use photos and process details Environment,Heat exposure?,Affects motors, brakes, panels, and operator safety,Declare furnace/hot area proximity Environment,Corrosive fumes or humidity?,Affects painting, enclosure, and components,Ask for coating/protection proposal Environment,Hazardous area or flameproof requirement?,Special compliance requirement,Do not leave to vendor assumption Safety,What limit switches are required?,Prevents overtravel and collision risk,Ask for all-motion limit/safety logic Safety,Emergency stop locations?,Affects operator control and emergency response,Map operator positions Safety,Overload protection required?,Prevents overload operation,Ask for load cell/overload relay basis Safety,Warning hooter/siren/light required?,Improves area awareness,Specify site expectations Safety,Anti-collision needed?,Needed with multiple cranes/runways,Declare shared bay use Safety,Walkway/maintenance access needed?,Affects maintainability and safety,Ask for safe access plan Operator,Control mode required?,Pendant/radio/cabin changes usability,Choose based on visibility and risk Operator,Operator training included?,Reduces misuse and acceptance issues,Make training a deliverable Operator,Language of manuals/training?,Avoids handover friction,Specify buyer team preference Vendor Scope,Is design included?,Clarifies engineering responsibility,Ask for design responsibility statement Vendor Scope,Is manufacturing included?,Core supply scope,Require manufacturing location if relevant Vendor Scope,Is transport included?,Commercial scope clarity,Define delivery point Vendor Scope,Is erection included?,Major hidden cost risk,Clarify tools, manpower, permits Vendor Scope,Is commissioning included?,Critical acceptance scope,Do not assume Vendor Scope,Is load test arrangement included?,Often disputed,Clarify test load responsibility Vendor Scope,Are civil/structural works excluded?,Common hidden gap,Assign owner clearly Vendor Scope,Are rails/runway included?,Common interface gap,Normalize quotes on same basis Documentation,GA drawing required?,Needed for approval and installation,Make drawing approval a milestone Documentation,Electrical drawings required?,Needed for maintenance and troubleshooting,Include before final handover Documentation,O&M manual required?,Needed for safe long-term operation,Do not release final payment without it Documentation,Spares list required?,Reduces downtime,Ask for critical and recommended spares separately Documentation,Test certificates required?,Acceptance evidence,Attach to handover list Acceptance,FAT required?,Catches issues before dispatch,Define scope and signoff Acceptance,SAT required?,Confirms site performance,Define load/no-load/safety tests Acceptance,What is snag closure process?,Prevents endless open points,Attach closure format Acceptance,Who signs acceptance?,Avoids authority confusion,Define buyer and vendor signatories Commercial,Payment milestones?,Controls cash vs completion risk,Tie payments to evidence Commercial,Delivery schedule basis?,Filters unrealistic commitments,Ask for drawing/procurement/manufacturing milestones Commercial,Warranty duration and start point?,Common dispute point,Define dispatch vs commissioning start Commercial,Service response commitment?,Important for uptime,Ask for response time and escalation route Commercial,Penalty/LD needed?,Controls delay risk,Keep reasonable and enforceable Commercial,Price validity?,Prevents quote expiry pressure,Record validity clearly Commercial,Taxes/freight/insurance included?,Avoids landed cost mismatch,Normalize all prices Reference,Relevant installations available?,Validates vendor claim,Ask for similar duty and capacity Reference,Can buyer speak to references?,Tests confidence,Prefer live call over brochure Reference,Any repeat customers?,Signals trust and service quality,Ask for repeat order examples Closeout,Training completion record?,Proof of handover,Add signoff sheet Closeout,Final documentation register?,Avoids missing records,Use handover checklist Closeout,Post-commissioning support period?,Covers early failures,Negotiate first 30-90 days support