EOT crane load testing and acceptance checklist

EOT Crane FAT/SAT Acceptance Checklist

Quick Answer

Before accepting an EOT crane, verify drawings, BOM/makes, workmanship, no-load operation, brake operation, limit switches, emergency stop, overload protection, load test evidence, punch list closure, commissioning records, and final handover documents.

FAT and SAT protect the buyer from discovering missing scope after final payment. FAT checks readiness before dispatch. SAT checks that the crane works safely at site after erection and commissioning.

Core FAT/SAT Checks

PhaseCheckEvidence
FATApproved drawings and BOM/makes match offerSigned drawing list and BOM sheet
FATHoist, CT, LT no-load operationFunctional test record
FATBrake, limit switch, emergency stop, overload checksTest record or simulation report
SATInstallation alignment and electrical checksCommissioning checklist
SATLoad test and safety device verificationLoad test certificate
HandoverManuals, certificates, drawings, spares listDocument register signed by buyer/vendor

Do Not Release Final Payment Until

  • Open punch points are closed or commercially retained.
  • Load test and safety tests are documented.
  • Operator and maintenance handover is complete.
  • Final drawings and certificates are received.
  • Warranty start date and service contacts are clear.